My pages,  pictures, and text - Copyright 1999 -
Terry Toenges
Email
grunt at sarget.com
Back to
Fourfouro
Home Page
My layout
Fort Michael
&
Shelby Station
Railroad
This site started:
4/20/2002
Page 10
Added 11/8/2005
Back to Page 9
of layout
s
Back to
Page 9
of layout
As of this month, November 2005, I'm changing my layout
from HO (1/87 scale) to On30 (1/48 scale).
I'm rearranging my track plan to accomodate the larger size equipment.
Back to Layout Index
Layout - Page 1
Layout - Page 2
Layout - Page 3
Layout - Page 4
Layout - Page 5
Layout - Page 6
Layout - Page 7
Layout - Page 8 Added 3/1/2004
Layout - Page 9 Added 3/1/2004
Layout - for 2004 see Christmas 2004 New 10/20/2016
You are here - my layout in progress - Page 10 Added 11/8/2005


Back to Fourfouro Home Page
Christmas tree layouts
Train projects
Links
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
These pics are from November 2005
These pics are from January 2006. For Christmas 2005, I had just covered up a lot
of the track with batting material and just left uncovered the tracks I used during
Christmas.
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
These pics were the last pics I took of my layout before I tore it all down.
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII